Bathroom remodeling enhances the look and use of the area, and most of the time, it adds value to your house. Among all the questions that people ask, the most common question is: how much time it takes for bathroom renovation? The duration of a bathroom renovation depends on some factors and cannot be determined easily.
In this article, we will review the various factors that cause a variation in the average time for the renovation.
Things That Can Contribute to the Duration of the Bathroom Renovation

Scope of the Renovation
If you have planned major alteration work such as the change of location of walls, shift of pipes, or the addition of the bath and toilet, the work will take longer. The more changes and the more new builds, the longer the duration.
Size of the Bathroom
The size of the bathroom, however, is another crucial aspect. A small bathroom will take less time to renovate than a larger one since more effort is expected to be put into the larger bathroom.
Type of Materials Used
The selection of materials can define the time taken for a bathroom renovation process. There are certain materials, such as natural stone, which could take longer to special order, longer to install, and may also take a longer time for drying.
Professional Involved
If you decide to work with a professional service provider, the time taken will depend on the provider’s current workload. However, it also depends on the specific tasks they are to handle as well as the number of subcontractors they deal with in their projects.
How Long Does It Take to Renovate a Bathroom?
Taking all the factors into consideration, it is estimated that bathroom renovations will take between two and six weeks.
Here is an average time that would be expected for each part of a bathroom remodel:

Step 1: Planning and Design
The planning of the work is the first phase of the bathroom renovation. First, a sketch of the new plan; second, the options of the materials and lighting; third, a list of all necessities, including machines, equipment and fixtures. It may be noted that, on average, this stage may take around 1- 2 weeks.
Step 2: Demolition
In this particular stage, fixtures, tiles, and floors are pulled out. This process requires one to two days depending on size of the bathroom and the kind of work that needs to be done.
Step 3: Plumbing and Electrical Work
Plumbing or electrical installation only takes a few days to a week. Plumbing may need to drain completely; changing of pipes and electrical lines may also take time.
Step 4: Framing and Drywall
After plumbing and some electrical work have been done, the next thing is framing and drywalling. Construction of the new structure, putting up the walls, fitting the drywall, and reinforcing where necessary can often take one week.
Step 5: Tiling and Flooring
Tiling and flooring are among the most critical aspects of the bathroom renovation. It usually takes anywhere between one to two weeks to get to this step, and it depends on what kind of material you’ll be using.
Step 6: Installing Fixtures
It will only take about 3 to 4 days fitting fixtures such as toilets, showers, and vanities. This is because such products require strict positioning for the system to function as intended and for aesthetic value.
Step 7: Painting and Finishing
Last steps include painting, applying all of the finishing touches (lights, mirrors, and cabinets), and putting the bathroom together as a whole. This stage generally lasts for about one week.
The time it takes to complete bathroom renovations depends on the extent, size, type of material to be used, and contractors. If one plans to renovate a full bathroom, then it will take two weeks to six weeks on average. If you follow good planning and design strategy then there is no doubt that people can create a bathroom that is not only pleasant to the eyes but can also serve its primary purpose and at the same time last for many years.